Solar & Battery Installation in Gauteng
Keep your lights on through load shedding and cut your electricity bill. We design and install hybrid inverters, LiFePO4 battery storage and solar panels for homes and businesses, sized to how you actually use power, and certify every installation with a CoC.
What's included
Load assessment
We look at your bill and appliances to work out what you need backed up.
System design
Inverter, battery and panel sizes matched to your usage and budget.
Installation
Neat installation and integration with your existing DB board.
Battery backup
LiFePO4 lithium batteries for safe, long-life storage.
CoC certificate
Every installation is tested and certified by a registered electrician.
Registration advice
Grid-connected systems usually need registering with your municipality or Eskom. We advise you on what applies.
Typical system sizes
| Monthly electricity bill | Inverter | Battery |
|---|---|---|
| Up to R5,000 | 5 kW hybrid | 5.3 kWh |
| R5,000 – R8,000 | 8 kW hybrid | 10.6 kWh |
| Over R8,000 | 10 kW 3-phase hybrid | 14.3 kWh |
A rough guide only. Your system is sized after a site assessment. Try the solar sizing calculator for an estimate.
Solar questions
Do I need a CoC for a solar or inverter installation?
Yes. Installing an inverter, batteries or solar panels is electrical installation work and needs a CoC from a registered electrician.
Can I start with an inverter and battery and add panels later?
Yes. A hybrid inverter can run on batteries alone for load-shedding backup, and panels can be added when you are ready, as long as the inverter is sized for them.
Do you install for businesses?
Yes. We install residential and commercial systems, including 3-phase installations.
Get a solar proposal
Mon–Fri 08:00–17:00 · Sat 08:00–13:00 · After hours when resources allow